Compromise fishplate furnish and install tips

Railway fishplate Production Process

Production process of fishplate include following steps: hot rolling of steel bars, cut to length, reheat, drilling holes, cooling. The production doesn’t include furnish process, but this process is necessary before the installation.

Rail Fishplate Production Flow

Fishplate production of AGICO is completely according to ISO9001-2008 quality system. AGICO has production license of the Ministry of Railways Products China, our railway fastener products quality is guaranteed by quality control inspectors and quality control system.

Why Fishplate is Still Popular in Rail Track System?

Fishplate has other names:rail joint bar, track joint, which is the connection between the rails, using fishplate has one obvious advantage-no rail welding work is needed, and most of time, it is more reliable, time saving, and maintenance work is easy.

Fishplate Hole Furnishing

As to the other rail joint method-welding, the technology is developed now, but welding process workload of a railway line is huge and would cost more time. Moreover welding might cause flaws that will not occur in short time. Its maintenance work is still complicated than just replacing a piece of rail joint bar.

Tips on Installation of Compromise Joint Bar

One special rail joint is called compromise joint bar or compromise fishplate, here AGICO will introduce furnishing and installation of compromise joint to you.

  • When using new compromise joint bar, you need to make sure its material meet with rail joint bar specifications; when using a used rail joint bar, it has to be inspected and accepted by engineer.
  • Compromise joint bar is used to connect 2 steel rail with different dimensions, it is the weak link in railway track system, so the installation has to be perfect to guarantee rail joint section is connected well. For example, cracks, breaks or other flaws, bolt holes with excessive wear are not allowed, when all bolts are tight, vertical movement is permitted or not.
  • Compromise joint bar lubricant shall have a petroleum base and contain a rust inhibitor
  • Compromise joints shall be installed so opposite rail joints are staggered at least 1.5 m
  • When joining rails of differing sizes with a compromise rail joint assembly, it shall be fitted so that the top of rail surface and the gauge face of the rails to be connected, are held in alignment. Bars must be installed, as markings indicate.
  • When it is necessary to provide additional bolt holes, it shall be done only by drilling with a rail drill of appropriate size, no other method is permitted.
  • Each compromise rail joint assembly shall be lubricated by spraying lubricating compound behind each joint bar as part of the installation procedure.

AGICO-Customize Comproise Joint Bar Design for Customers

Compromise Fishplate with Spike
Railway Fishplate with Rail Clamp

AGICO is the best compromise joint bar manufacturer in China, has the experiences of producing customized fish plate for customer of maintenance and repair work of railway lines, aigco is one largest fishplate production base in China, fishplate can be produced by 2 methods:hot rolling and forging, fish bolt, track bolt, and other types of rail joints are also available, welcome to visit AGICO and if you are interested in railway fastening products, don't hesitate contact us now!